View Requests - 923 found
Backlane Maintenance at 615 9 Av NW
Major pot holes and pooling water requires gravel grading
OPENED
Will be Addressed in Backlane Program. JA SEPT 3/24This will be addressed in our backlane program. -
4 months ago
#24-00689607
|
|
Backlane Maintenance at 615 15 Av NE
We were hoping to get a grader out to smooth out the back lane before winter. There are a lot of potholes in the lane.
OPENED
Will be Addressed in Backlane Program. JA SEPT 3/24This will be addressed in our backlane program. -
4 months ago
#24-00689977
|
|
|
Backlane Maintenance at 307 41 Av NE
Horrible potholes
OPENED
Move to Future Hot Box List - Backlane. JA SEPT 3/24This will be addressed in backlane pothole hotbox list. -
4 months ago
#24-00684323
|
|
Backlane Maintenance at 3604 2 St NW Highland Park
The amount of pot holes in the alley reminds me of when I was on tour in Syria. Everyone needs an upgraded suspension for their vehicles. This should be completed at the beginning of summer. Please prioritize this. Thank you.
OPENED
Will be Addressed in Backlane Program. JA SEPT 3/24This will be addressed in our backlane program. -
4 months ago
#24-00685668
|
|
|
Backlane Maintenance at 419 Hendon Dr NW
Clean up and regrade of back alley
OPENED
Will be Addressed in Backlane Program. JA SEPT 3/24This will be addressed in our backlane program. -
4 months ago
#24-00686772
|
|
|
Backlane Maintenance at 100 Covepark Dr NE
Huge ruts and dips throughout the entire back lane. The sand mix they use to fix this constant issue just washes away and pools at the bottom spilling out onto the road.
OPENED
Will be Addressed in Backlane Program. Sep 3 - This lane was already graded on July 31/24; we will not be entertaining re-grading requests until all other lanes in the district have been addressed first. - JT. -
4 months ago
#24-00689382
|
|
Backlane Maintenance at 511 22 Ave NW Northwest Calgary
The lane way behind our house needs maintenance after construction trucks have used it over the last 6 months. It hasn’t been maintained based on the city’s schedule
OPENED
Will be Addressed in Backlane Program. JA SEPT 3/24This will be addressed in our backlane program. -
4 months ago
#24-00691373
|
|
|
Backlane Maintenance at 440 18 Av NE
OPENED
Move to Future Out of Season Backlane Maint List -
4 months ago
#24-00276937
|
|
Backlane Maintenance at 428 20 Ave NW Northwest Calgary
Back Lane of 400 block of 20/21 Ave NW
OPENED
Will be Addressed in Backlane Program. JA SEPT 3/24This will be addressed in our backlane program. -
4 months ago
#24-00692449
|
|
|
Backlane Maintenance at 59 Rosery Dr NW
Need gravel in deep ruts
OPENED
Will be Addressed in Backlane Program. JA SEPT 3/24This will be addressed in our backlane program. -
4 months ago
#24-00685330
|
|