Road Repair at 7932 34 Av NW

CLOSED 17 days ago #23-00644379
Report
Submitted Sat Aug 26, 2023

Asphalt needs to be replaced after a sidewalk replacement.

Issue: Uneven Surface / Cracks

Specific details of the issue: Portions of the sidewalk on 34 Ave NW between 77th and 79th street were replaced, more than 3 weeks ago, and they left barricades but no one has come back to replace the asphalt that was removed to accommodate the sidewalk repair. I call about this last week, and all that was done was the barricades were removed, but there is still a dangerous gap in the road that needs to be repaired. This is affecting many peoples ability to park on the street, where space is already limited.

Specific location details: Various spots on 34 Ave NW, between 77th and 79th Street.

Type of Road: Paved Public Road



address: 7932 34 AV NW

coordinates x,y: -14154.409976103012, 5661131.37506413

coordinates lat,lng: 51.08622454395753, -114.2020313818698

ward: 1

Timestamp Description
Thu Sep 07, 2023 12:29pm Closed
Sat Aug 26, 2023 05:36pm Opened
Sat Aug 26, 2023 05:33pm Submitted via iPhone Iphone