Backlane Maintenance at 2040 34 Av SW

OPENED Move to Future Out of Season Backlane Maint List. JG - 2024-10-27- Lane inspected and drivable; No significant potholes or ruts; All back lanes are inspected during the annual lane program. Gravel Lane Program runs from late June to late October. Please see online schedule https://www.calgary.ca/roads/maintenance/gravel-lane-repair.htmlThe ONLY way to eliminate these ongoing pothole/mud/rut/dust issues in lanes is by having the lane paved via local Improvements. This is REQUIRED to be initiated by an adjacent property owner(s) (maybe caller) by petition. Info is available on the Calgary.ca website. (https://www.calgary.ca/roads/local-improvements.html)updated address from comments. - about 1 month ago #24-00715144
Photo_20240910_074222
Submitted Tue Sep 10, 2024

Big puddle in back lane after city has tried 3 times

Issue: Pothole

Specific details of the issue: Three attempts to grade lane is another fail. Three strikes and it is time for a new grader operator

Specific Location details: Laneway behind 6379 33ave nw

Type of Backlane: Gravel Backlane



address: 2040 34 AV SW

coordinates x,y: -7661.837580980227, 5654140.102113375

coordinates lat,lng: 51.0234985, -114.1092127

ward: 1

Timestamp Description
Sun Oct 27, 2024 12:29pm Move to Future Out of Season Backlane Maint List
Tue Sep 10, 2024 03:49pm Field Inspection Required
Tue Sep 10, 2024 07:47am Opened
Tue Sep 10, 2024 07:46am Submitted via Android Android