Backlane Maintenance at 111 Beaconsfield Ri NW

OPENED Will be Addressed in Backlane Program. JG - 2024-09-11 - Lane was inspected and placed on Future Lane Grader Maintenance List for the Gravel Lane. Gravel Lane Program runs from late June to late September. Due to Water Emergency Gravel Lane Program is behind schedule. Please see online schedule https://www.calgary.ca/roads/maintenance/gravel-lane-repair.htmlThe ONLY way to eliminate these ongoing pothole/mud/rut/dust issues in lanes is by having the lane paved via local Improvements. This is REQUIRED to be initiated by an adjacent property owner(s) (maybe caller) by petition. Info is available on the Calgary.ca website. (https://www.calgary.ca/roads/local-improvements.html). - 3 months ago #24-00718145
Report
Submitted Tue Sep 10, 2024

Alley has large washed out areas due to heavy rain over last month. Front of alley someone dumped large mounds of sand but never filled anything properly. Cars had to drive over mounds as big as speed bumps. Sand will just be washed on to road. Proper maintenance needed in entire alley before winter otherwise people will get stuck due to crevices. Thanks

Issue: Rut / Gravel Request

Specific details of the issue: Needs grating and filling

Specific Location details: Entire alley

Type of Backlane: Gravel Backlane



address: 111 BEACONSFIELD RI NW

coordinates x,y: -7128.863121661599, 5665985.859852851

coordinates lat,lng: 51.12999479813195, -114.1018491477448

ward: 4

Timestamp Description
Wed Sep 11, 2024 07:40am Will be Addressed in Backlane Program
Tue Sep 10, 2024 07:18pm Opened
Tue Sep 10, 2024 07:17pm Submitted via iPhone Iphone