Backlane Maintenance at 6131 Bowness Rd Nw, Calgary, Ab T3 B0 C9

OPENED Will be Addressed in Backlane Program. JG - 2025-04-02 - All back lanes are inspected during the annual lane program. Gravel Lane Program runs from late June to late September. If your lane does not get graded this year, it will be reassessed for possible lane grading during next year's lane program. Please see online schedule https://www.calgary.ca/roads/maintenance/gravel-lane-repair.htmlThe ONLY way to eliminate these ongoing pothole/mud/rut/dust issues in lanes is by having the lane paved via local Improvements. This is REQUIRED to be initiated by an adjacent property owner(s) (maybe caller) by petition. Info is available on the Calgary.ca website. (https://www.calgary.ca/roads/local-improvements.html). - 16 days ago #25-00215750
Report
Submitted Wed Apr 02, 2025

The back lane behind 6131 bowness road is full of potholes.

Issue: Pothole

Specific details of the issue: There are several deep potholes

Specific Location details: Back lane 6131 bowness road nw

Type of Backlane: Gravel Backlane



address: 6131 BOWNESS RD NW, CALGARY, AB T3B0C9

coordinates x,y: -12287.550666237552, 5660810.165761696

coordinates lat,lng: 51.08338, -114.1753742

ward: 1

Timestamp Description
Wed Apr 02, 2025 08:46am Will be Addressed in Backlane Program
Wed Apr 02, 2025 08:40am Opened
Wed Apr 02, 2025 08:39am Submitted via iPhone Iphone