OPENED
Will be Addressed in Backlane Program. JG - 2025-04-02 - All back lanes are inspected during the annual lane program. Gravel Lane Program runs from late June to late September. If your lane does not get graded this year, it will be reassessed for possible lane grading during next year's lane program. Please see online schedule https://www.calgary.ca/roads/maintenance/gravel-lane-repair.htmlThe ONLY way to eliminate these ongoing pothole/mud/rut/dust issues in lanes is by having the lane paved via local Improvements. This is REQUIRED to be initiated by an adjacent property owner(s) (maybe caller) by petition. Info is available on the Calgary.ca website. (https://www.calgary.ca/roads/local-improvements.html). -
16 days ago
#25-00215750
Submitted Wed Apr 02, 2025
The back lane behind 6131 bowness road is full of potholes.
Issue:
Pothole
Specific details of the issue:
There are several deep potholes
Specific Location details:
Back lane 6131 bowness road nw
Type of Backlane:
Gravel Backlane
address: 6131 BOWNESS RD NW, CALGARY, AB T3B0C9
coordinates x,y: -12287.550666237552, 5660810.165761696
coordinates lat,lng: 51.08338, -114.1753742
ward: 1
Timestamp |
Description |
Wed Apr 02, 2025 08:46am |
Will be Addressed in Backlane Program
|
Wed Apr 02, 2025 08:40am |
Opened
|
Wed Apr 02, 2025 08:39am |
Submitted via iPhone
|